Quality & compliance

Make the packaging route clear before production.

Quality starts with verified material platforms, certified manufacturing facilities, and target-market food safety compliance. We confirm the evidence and test documents available for your specific product.

Compliance architecture

Three tiers of quality and regulatory assurance

Manufacturing Standard

Certified Manufacturing

ISO 9001 · FSSC 22000 · BRCGS · GRS

Audited facilities operating under international food safety and recycled content standards.

FSSC 22000ISO 9001BRCGSGRS (rPET)QS License
  • FSSC 22000 & ISO 9001Global food safety & quality management
  • BRCGS StandardFood packaging manufacturing audit
  • GRS Certified rPET30%–100% verified post-consumer recycled content
  • QS National LicenseCertified food-grade PET, PP, PS and ABS containers
Food-Contact Compliance

Food-Contact Safety

EU 10/2011 · US Prop 65 · GB 4806.7 · PFAS-Free

Full chemical safety and heavy metal migration testing for US, EU and global markets.

EU 10/2011US Prop 65PFAS-FreeGB 4806.7Prime Resin DoC
  • 3-Tier Declarations of Compliance (DoC)Prime resin, finished packaging & printing ink
  • EU 10/2011 & (EU) 2020/1245Overall & specific heavy metal migration pass
  • California Prop 65Safe Drinking Water & Toxic Enforcement compliant
  • 470+ PFAS-Free TestedZero fluorine chemicals in food contact layers
Inspection & Control

100% Quality Inspection

IQC Incoming · IPQC In-Line · OQC Final Audit

Zero-defect quality gates from raw polymer verification to final shipment release.

100% Full AuditIQC / IPQC / OQCBatch TraceabilitySample Retention
  • IQC Resin TestingIncoming polymer batch checks & certificate audit
  • IPQC In-Line ControlAutomated thickness & optical defect screening
  • 100% Pre-Shipment AuditDimensions, sealing fit & defect-free release
  • Full Batch TraceabilityProduction logs & retained physical samples

Manufacturing environment

Food-grade cleanroom facilities & automated lines

Our container and tray manufacturing operates in enclosed cleanrooms equipped with positive-pressure air filtration, anti-static dust control flooring, and automated in-line feeding systems.

Tooling & Engineering Asset

Standard mould inventory & rapid custom tooling turnaround

Dedicated multi-cavity thermoforming mould storage and tooling inventory
Engineering Asset Infrastructure

Dedicated Mould Staging & Multi-Cavity Tooling

From rapid 3D prototyping to multi-cavity hardened steel production moulds. Our organized tooling storage houses standardized and custom dies for cups, snap-fit lids, and compartment food trays.

  • Standard Die Library: Hundreds of ready-to-run tooling bases to eliminate upfront tooling costs on standard sizes.
  • Custom Engineering: Precision CNC-machined forming cavities and trim dies tailored to your fill-line tolerances.
  • Tooling Lifecycle Care: Routine ultrasonic cleaning, dimensional calibration, and climate-controlled storage between production cycles.

Our review

Three checks before the next decision

Material and application matching

We review food-contact direction, heat or cold use, barrier needs, sealing compatibility and the intended product experience before recommending a route.

Specification review

Dimensions, capacity, weight, color, print, mold details and forming process are checked against the brief before sampling.

Production-route coordination

The same product realization team coordinates sample preview, forming process, quotation and production handoff with the relevant manufacturing route.

Evidence pack

What we can prepare for a product review

  • Declarations of Compliance (DoC) for Prime Resin, Finished Packaging & Food-Grade Printing Ink
  • Technical Data Sheets (TDS) and Material Safety Data Sheets (MSDS)
  • Third-party food-contact migration test reports (EU 10/2011, US Prop 65, GB 4806.7)
  • PFAS-Free and non-fluorescent optical brightener declarations
  • Facility management certifications (ISO 9001, FSSC 22000, BRCGS, GRS)
  • Custom packaging drawings and dimensional tolerance specifications

Certificates, declarations and test documents are confirmed by product, material formulation and market destination. Ask us what is available for your exact specification.

Before you ask for a quote

What to include in a quality review

Send the product application, food type, contact time and temperature, target market, material direction, dimensions and sealing or forming requirements. The applicable documents and testing route depend on the exact specification. See the RFQ checklist.

Next step

Ask for the quality and compliance documents for your route

Share your specs or use scenario — our team will evaluate tooling feasibility and provide a 3D visual review within 1 business day.